Commercial EV charging stations installed at an Oregon property

Commercial EV Charging · Oregon

Commercial EV Charging Solutions Built for Your Property

Apartments, hotels, retail centers, offices, and fleets. We assess the site and electrical infrastructure, plan Level 2 or DC fast charging sized to real demand, coordinate permitting and licensed electrical work, and set up networked management with payment and access controls.

  • Site assessment and charger placement
  • Level 2 and DC fast-charging planning
  • Electrical infrastructure and load planning
  • Networked management, payment, and access
Local ServiceClear Project PricingProfessional InstallationContinued Support

0 kW+

DC fast charging planned where parking turnover is high

0 kW

Level 2 per port for overnight and workday dwell

0%

Networked ports with access rules and usage reporting

0

Accountable team across design, permitting, and support

Built for your property type

Multifamily

Resident-assigned and shared ports with access control and usage tracking.

Hotels & hospitality

Guest charging placed for visibility, with session limits that keep stalls open.

Retail & restaurants

Customer charging sized for turnover, with signage and reliable uptime.

Workplace & fleet

Depot and employee charging planned around duty cycles and capacity.

Problems we solve

If any of these sound familiar, an on-site assessment is the fastest way to a real fix.

Demand you can't estimate

You know residents, guests, or employees want charging, but not how many ports to install or where they belong.

Electrical infrastructure unknown

Service size, panel space, and existing load are the real constraints — they need an on-site review and load planning.

Trenching and parking layout

Port placement affects traffic flow, ADA stalls, signage, and how far conduit has to run.

Chargers installed but offline

Stations without reliable network connectivity can't report usage, take payment, or be diagnosed remotely.

No access or payment plan

Without access rules and billing configured, ports get occupied by the wrong drivers all day.

Too many vendors

Electrician, charger brand, network provider, and property management with no single accountable team.

Why choose Willamette Smart Solutions

Right-sized deployment

Port count and power levels matched to actual driver demand, dwell time, and available electrical capacity.

Level 2 and DC fast planning

We plan the mix — overnight Level 2 for residents and employees, faster charging where turnover is high.

Infrastructure and load planning

Service, panel, and load calculations reviewed up front, including load management where capacity is tight.

Permitting and licensed coordination

We manage the project and coordinate permits, utility steps, and licensed electricians for the electrical scope.

Networked management

Usage visibility, access rules, and payment options configured so the system runs without daily attention.

Multi-property deployment

Standardized equipment and configuration across sites so support and reporting stay consistent.

Level 2, DC fast, or a planned mix

Power level follows dwell time. Most properties end up with a mix — and conduit planned for the ports you'll add next.

Common pickLong dwell

Level 2 · 7–11 kW

Apartments, offices, and hotels where vehicles sit for hours.

  • Lowest infrastructure cost per port
  • Load management across banks
  • Resident and employee access rules
High turnover

DC fast · 60–180 kW

Retail, travel corridors, and fleet duty cycles that can't wait.

  • 20–40 minute useful charge
  • Utility and transformer coordination
  • Payment and pricing configuration
Future-proofing

Phased deployment

Install what demand justifies today, without redoing the trench.

  • Conduit and panel space pre-planned
  • Standardized equipment across sites
  • Add ports without new civil work

We're vendor-neutral — the recommendation follows your property and vehicles, not our stock.

How a commercial charging site comes together

01

Capacity study

Service size, panel space, and existing load reviewed against target port count.

02

Site layout

Stall placement, ADA, traffic flow, signage, and conduit or trench routing.

03

Build coordination

Permitting, utility steps, and licensed electrical work managed on one schedule.

04

Network & billing

Access rules, session pricing, usage reporting, and remote diagnostics.

One accountable team from the capacity study through commissioning — so property management isn't refereeing four vendors.

Commercial charging, engineered

Ports that stay online and pay for themselves.

Right-sized power, networked management, and conduit planned for expansion — designed before the first stall is marked.

Charging is now an expected amenity.

Have us assess your property's electrical capacity and parking, then give you a plan and price you can budget against.

How your project works

STEP 01

Assessment

We walk the property, test what you have today, and document every problem area before recommending anything.

STEP 02

Solution plan

A written plan with the equipment, layout, and scope in plain language — plus clear project pricing before work starts.

STEP 03

Professional installation

Clean, code-conscious installation by our own team, tested and verified area by area before we leave.

STEP 04

Continued support

One local number for adjustments, added devices, or questions after the project is finished.

On-site technology assessments begin at $250 and may be credited toward an approved project. Final pricing depends on property conditions and project scope.

Schedule an on-site assessment

Tell us what's happening at the property and we'll schedule a technician to look at it in person. Prefer to talk it through first? Call (541) 228-9419.

Serving the Willamette Valley and surrounding rural Oregon.

Request My Assessment

On-site technology assessments begin at $250 and may be credited toward an approved project. Final pricing depends on property conditions and project scope.

What the work looks like

EV chargers at a multifamily property
Multifamily and workplace charging planned around parking assignments.
EV chargers at a hotel entrance
Guest and customer charging placed for visibility and traffic flow.
EV charging connector in use
Stations commissioned, networked, and tested before handoff.

You shouldn't have to coordinate an internet provider, camera company, POS vendor, electrician, and IT technician. Willamette Smart Solutions brings the entire solution together with one accountable local team.

Areas we serve in Oregon

We work throughout the Willamette Valley and surrounding rural areas, including:

  • Eugene
  • Springfield
  • Albany
  • Corvallis
  • Salem
  • Junction City
  • Veneta
  • Creswell
  • Cottage Grove
  • Harrisburg
  • Monroe
  • Philomath
  • Lebanon
  • Sweet Home

Frequently asked questions

Schedule a commercial EV site consultation.

Tell us about the property and expected demand, or call and talk it through with our team.

Willamette Smart Solutions · (541) 228-9419 · info@willamettesmart.com

Schedule a commercial EV site consultation

Tell us about the property and expected demand. Our team follows up during business hours.

On-site technology assessments begin at $250 and may be credited toward an approved project. Final pricing depends on property conditions and project scope.